Print View

Your printed page will look something like this.

https://www.trendsetterengineering.com/hydraulic-intervention/

Hydraulic Intervention

Subsea Hydraulic Intervention

With the renewed focus on maximizing existing subsea field production through hydraulic interventions, Trendsetter identified the need for a 15,000psi high flow system suitable for deployment from a vessel and capable of multiple interface configurations with subsea trees, manifolds and flowlines.

The STIM System (Subsea Tree Injection Manifold), available for offshore service, provides the industry with this exact solution. Designed first and foremost to provide regulatory compliant well control capabilities, the high flow/high pressure STIM System utilizes the latest in control system, production gate valve and subsea connector technology to deliver a bespoke fluid delivery system, allowing for safe and efficient well stimulation and field hydrate remediation operations.

ABOUT TRENDSETTER'S STIM SYSTEM:

  • Metal-to-Metal Gasket Sealing
  • Up to 10,000 ft WD
  • Rated for up to 250 °F
  • Rated for up to 15,000 psi

DOWNLOAD DATA SHEET (PDF)

BSEE WELL REGULATIONS (PDF)

 

 Contact Us

Hydraulic Remediation Unit

Trendsetter's patented (U.S. Patent No. 10,273,785) Hydrate Remediation Unit allows for the use of continuous gas injection method of hydrate remediation.  Utilizing Trendsetter’s field proven 15K STIM or Hydrate Remediation Units, this methodology has the potential to reduce hydrate remediation projects by days or weeks, depending on the situation.

 

FEATURES AND BENEFITS:

  • Vertical Fluid Conduit Assembly run via Coil Tubing
  • Horizontal Fluid Conduit Assembly w/ Flowline Interface
  • 1” Hoses complete with optional Passive Breakaway Assembly
  • 1” Hose with customer preferred interface stab
  • 1” 17H Hi-Flow Hot Stabs

 

Hydrate Remediation Unit (HRU)

 

Contact Us