Houston, Texas – Trendsetter Engineering, Inc. is pleased to announce that they have been awarded a contract for the design, qualification and delivery of a 20K Hydraulic Intervention Connector by HWCG. The 20K connector is designed to interface with the HWCG 20K Capping Stack and would be utilized to conduct flowback or intervention operations after the capping stack has been …