The July 2013 issue of the Journal of Petroleum Technology covers the industry’s well capping history and future, highlighting Trendsetter’s work designing and manufacturing four world-class capping stack systems for Oil Spill Response Limited. Click here to read the article.
Subsea Solutions News
87 News Found
“We have developed a First Response Well Containment System (FRWCS) using equipment and technology located in Newfoundland and Labrador so we will be able to provide an immediate and local response to contain spills at the source. The technology we’re using is the first of its kind in Newfoundland and Labrador and in Canada. We can help protect and save …
Trendsetter Engineering, Inc. has been awarded the contract by Oil Spill Response Ltd (OSRL)
Trendsetter Ranks #11 on Houston Business Journal's Fast 100 List and Wins Enterprise Champion Award
The Houston Business Journal (HBJ) ranked Trendsetter Engineering #11 on its annual Fast 100 list.
Trendsetter Engineering, Inc. is pleased to announce the completion of an Arctic Capping Stack (ACS).
Trendsetter’s new building, with its additional 20,000 square feet of work space and five-story height will also house a large bridge crane with two 100-ton trolleys.
Importantly, the unique technical features of HWCG’s 15,000 psig intervention capping stack allow full access to the wellbore so an operator can repair the well or intervene in the mechanical condition of the well, in addition to allowing the capture and flow back of oil. Engineered by Trendsetter Engineering, Inc., the 156,000-pound capping stack features a full opening bore and …