Trendsetter Engineering successfully completed the design and build of a state-of-the-art capping stack for Wild Well Control. The 18-3/4” 15,000 psi capping stack was designed, manufactured, and assembled within nine months. The cutting edge well capping equipment is designed so that it can be deployed around the world, via air freight or ocean freight, in the event of a subsea …